In God We Trust - Established 2008
(606) 638-0123606-624-9019 markgrayson@me.com
In God We Trust - Established 2008
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
TheLevisaLazer.com
No Result
View All Result
Advertisement
LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY POPULAR 19 YEAR-OLD WOMAN FROM KERMIT AREA DIES IN CRASH WITH COAL TRUCK Lawrence Co. Cheer headed to Disney in February; 15th Region Runner-Up PAIR OF LCHS STUDENTS CHOSEN FOR ALL-STATE CHOIR Lawrence Co. local government offices will be **closed** on Thursday and Friday
Three Rivers HH digital ad-AAd-bannerfuneral1leader1joe_young_banneer
Levisa-Lazer-Banner-Ad-copyFoothills-Bundle
Home Content Announcements

KYTC Contractor set to start project on KY 201 in Lawrence County Tomorrow

Sara George by Sara George
June 10, 2020
in Announcements
Share on FacebookShare on Twitter

KYTC Contractor set to start project on KY 201

in Lawrence County Tomorrow

LAWRENCE COUNTY – (Wednesday, June 10, 2020) – Prep work on a section of KY 201 in Lawrence County is set to begin at 6:30 a.m. tomorrow, Thursday, June 10. Roadway resurfacing is expected to start on Monday, June 15.

The area is on KY 201 North between mile point 10, just before Parker Fork Road, and mile point 15, just after Twin Licks Road. Mountain Enterprises was awarded the low bid contract on the 4.55-mile project at $430,825.08.

Prep work includes cutting edge keys at either end of the project and cutting away sod and debris from the pavement edges throughout the work zone. This involves milling notches the same thickness as the new surface and transitioning the milling material into the rest of the highway area. This eliminates bumps when driving newly resurfaced roadway by tying the new asphalt into the old pavement at the same elevation.

Mountain Enterprises usually works from about 6:30 a.m. until 8:00 p.m. four days a week, Mondays through Thursdays. This project is expected to take about five days total, weather permitting.

One lane traffic will be maintained throughout the work zone at all times. However, motorists should be prepared to slow down, as driving lanes will change depending on which lane is being paved.

ShareTweetPinShareScanSend
Next Post
Tolsia Baseball hosting Annual Golf Scramble this Saturday and Softball Tournament next month

Tolsia Baseball hosting Annual Golf Scramble this Saturday and Softball Tournament next month

   TheLevisaLazer.Com   
TheLevisaLazer.com

In God We Trust - Established 2008

Follow Us

Quick Links

  • News
  • Lifestyles
  • Stay Ahead with Lazer Sports News
  • Education
  • Obituaries
  • About Us
  • Business & Politics News
  • Addiction & Recovery

Quick Links

  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Big Sandy Sportsman
  • Lazer ad prices and sizes
  • Editorials
  • Lazer announcments, bids and notices
  • Health News

Recent News

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

November 29, 2024

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.

No Result
View All Result
  • News
  • Stay Ahead with Lazer Sports News
  • Lifestyles
  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Obituaries
  • Regional News
  • Announcements

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.