In God We Trust - Established 2008
(606) 638-0123606-624-9019 markgrayson@me.com
In God We Trust - Established 2008
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
TheLevisaLazer.com
No Result
View All Result
Advertisement
LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY POPULAR 19 YEAR-OLD WOMAN FROM KERMIT AREA DIES IN CRASH WITH COAL TRUCK Lawrence Co. Cheer headed to Disney in February; 15th Region Runner-Up PAIR OF LCHS STUDENTS CHOSEN FOR ALL-STATE CHOIR Lawrence Co. local government offices will be **closed** on Thursday and Friday
Three Rivers HH digital ad-AAd-bannerfuneral1leader1joe_young_banneer
Levisa-Lazer-Banner-Ad-copyFoothills-Bundle
Home Content Business/Politics

CLARK CO. KY. POWER CO-OP SET TO BREAK GROUND ON SOLAR FARM

Admin by Admin
May 9, 2017
in Business/Politics
Share on FacebookShare on Twitter

More than 32,000 of these solar panels will be installed during the coming months on property owned by East Kentucky Power Cooperative. The utility is building a solar farm on 60 acres of its property along Interstate 64 and U.S. 60. Ground is scheduled to be broken for the project on Tuesday. (Photo by Fred Petke)

Right now, 60 acres of land between Interstate 64 and U.S. 60 in Clark County contains a lot of grass and a few test pilings.

By the end of the year, the rolling hills should be converted into a solar farm to generate electricity for customers of East Kentucky Power Cooperative.

Last summer, the company announced a $17.7 million project to build the facility on land near its headquarters outside Winchester. On Tuesday, officials will break ground for the project on the property along Lexington Road.

EKPC External Communications Manager Nick Comer said customers have been asking for renewable energy options, including solar, for a while. This is EKPC’s first attempt with solar energy.

“We’re learning as we go,” Comer said. “This is something new with East Kentucky Power.

Project manager Matt Clark said most of the 32,000 solar panels will be mounted in a fixed location in the field. Of those, 1,900 will motorized and able to track the sun as it moves across the sky during the course of the day. The difference in energy collection between fixed and tracking panels remains to be seen.

“We’ll measure the efficiency vs. the cost difference,” Clark said.

Overall, the facility is expected to generate 8.5 megawatts. EKPC’s three power plants, powered by coal or natural gas, generate 3,000 megawatts total, Comer said.

“It’s a little drop in the bucket,” he said. It is a drop both residential and commercial customers have asked for from their electricity providers, including Clark Energy, he said.

To receive the benefits from the solar panels, customers can pay $460 for a 25-year license for one panel. With the license, customers will receive a bill credit beginning in January 2018 for the energy generated by the solar farm, Comer said. The amount of the credit will be based on the energy generated by their share of the panels, he said.

Solar technology has been around for decades, but the technology has recently become more affordable and more efficient, Comer said. Still, it’s not a complete replacement for coal or natural gas to fuel power plants.

“Even in optimal conditions you’ll get eight to 10 hours of sunlight” a day,” he said. “In winter, they produce about half the energy they would in peak conditions.”

Over time, the panels will lose efficiency as well.

The length of the license coincides with the life expectancy of the panels, Clark said.

“We have a warranty from the manufacturer for (25 years),” he said. “After 25 years, the (degeneration) is more rapid. Twenty-five is the optimum for high efficiency.”

Solar energy is growing in Kentucky. In April, Berkeley Energy and EDF Renewable Energy announced plans to pursue building a 50 to 100-megawatt solar farm on two strip mine sites in Pike County. Kentucky Utilities also recently opened a 10-megawatt, 50 acre site in Mercer County.

While EKPC has no current plans for more solar facilities, Comer wouldn’t rule out the possibilty for the future.

By Whitney Leggett
The Winchester Sun

ShareTweetPinShareScanSend
Next Post
Jobe and Fletcher

CLERK CERTIFIES PETITION, 'NICKEL TAX' WILL BE ON BALLOT

   TheLevisaLazer.Com   
TheLevisaLazer.com

In God We Trust - Established 2008

Follow Us

Quick Links

  • News
  • Lifestyles
  • Stay Ahead with Lazer Sports News
  • Education
  • Obituaries
  • About Us
  • Business & Politics News
  • Addiction & Recovery

Quick Links

  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Big Sandy Sportsman
  • Lazer ad prices and sizes
  • Editorials
  • Lazer announcments, bids and notices
  • Health News

Recent News

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

November 29, 2024

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.

No Result
View All Result
  • News
  • Stay Ahead with Lazer Sports News
  • Lifestyles
  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Obituaries
  • Regional News
  • Announcements

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.