In God We Trust - Established 2008
(606) 638-0123606-624-9019 markgrayson@me.com
In God We Trust - Established 2008
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
TheLevisaLazer.com
No Result
View All Result
Advertisement
LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY POPULAR 19 YEAR-OLD WOMAN FROM KERMIT AREA DIES IN CRASH WITH COAL TRUCK Lawrence Co. Cheer headed to Disney in February; 15th Region Runner-Up PAIR OF LCHS STUDENTS CHOSEN FOR ALL-STATE CHOIR Lawrence Co. local government offices will be **closed** on Thursday and Friday
Three Rivers HH digital ad-AAd-bannerfuneral1leader1joe_young_banneer
Levisa-Lazer-Banner-Ad-copyFoothills-Bundle
Home Content Business/Politics

Paving, patching season under way in Martin County; work includes sections of KY 292, 1714, Milo Road

Sara George by Sara George
May 6, 2021
in Business/Politics
Share on FacebookShare on Twitter

Microsurfacing projects set for KY 292, 1714

MARTIN COUNTY (May 6, 2020) – Highway District 12 Chief District Engineer Mary Westfall-Holbrook today announced that the Kentucky Transportation Cabinet has approved two microsurfacing projects and three asphalt patching projects in Martin County. The work is scheduled for completion by November 30, 2021, barring any unforeseen circumstances. Last year’s schedule was interrupted by complications resulting from the COVID-19 pandemic.

The following list is not necessarily the order in which the work will be done. The contractor will determine the start dates for each project, all of which are weather dependent, as well as work hours and number of working days each week. Each project will require lane closures, so motorists should watch for signs and prepare to reduce their speed limit throughout the work zones.

KY 292 – from the Pike County line to the junction of KY 1714 (mile points 0.0 – 12.2, a distance of 12.2 miles), microsurfacing. NOTE: Microsurfacing is the application of a polymer surface over the asphalt to extend the life of the pavement.

KY 1714 – from Little Peter Cave Road to the junction of KY 1714 (mile points 8.172 – 10.762), microsurfacing.

KY 1439 – from the Pike County line at Meathouse to the intersection with KY 2032 at Wolfe Creek (mile points 0.0 – 10.733), asphalt pavement patching.

KY 1714 – from the beginning of state maintenance at the intersection of Pigeon Roost Creek and Caney Fork to the intersection with KY 2032 (mile points 0.0 – 5.150), asphalt pavement patching.

KY 1884 – Milo Road, from KY 40 to KY 3 (mile points 0.0 – 5.161), asphalt pavement patching.

ShareTweetPinShareScanSend
Next Post
FGHSAA 2021 Distinguished Alumnus of the Year award recipient announced

FGHSAA 2021 Distinguished Alumnus of the Year award recipient announced

   TheLevisaLazer.Com   
TheLevisaLazer.com

In God We Trust - Established 2008

Follow Us

Quick Links

  • News
  • Lifestyles
  • Stay Ahead with Lazer Sports News
  • Education
  • Obituaries
  • About Us
  • Business & Politics News
  • Addiction & Recovery

Quick Links

  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Big Sandy Sportsman
  • Lazer ad prices and sizes
  • Editorials
  • Lazer announcments, bids and notices
  • Health News

Recent News

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

November 29, 2024

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.

No Result
View All Result
  • News
  • Stay Ahead with Lazer Sports News
  • Lifestyles
  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Obituaries
  • Regional News
  • Announcements

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.