In God We Trust - Established 2008
(606) 638-0123606-624-9019 markgrayson@me.com
In God We Trust - Established 2008
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
  • News
    • Regional News
    • Announcements
    • Recollections
  • Sports News
    • Big Sandy Sportsman
  • Lifestyles
  • Courthouse
  • Obituaries
No Result
View All Result
TheLevisaLazer.com
No Result
View All Result
Advertisement
LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY POPULAR 19 YEAR-OLD WOMAN FROM KERMIT AREA DIES IN CRASH WITH COAL TRUCK Lawrence Co. Cheer headed to Disney in February; 15th Region Runner-Up PAIR OF LCHS STUDENTS CHOSEN FOR ALL-STATE CHOIR Lawrence Co. local government offices will be **closed** on Thursday and Friday
Three Rivers HH digital ad-AAd-bannerfuneral1leader1joe_young_banneer
Levisa-Lazer-Banner-Ad-copyFoothills-Bundle
Home Content Regional News Headlines: Daily News Briefing

Construction Starts April 26 on Pikeville Medical Center Pedestrian Tunnel

Sara George by Sara George
April 20, 2021
in Regional News Headlines: Daily News Briefing
Share on FacebookShare on Twitter

Construction Starts April 26 on

Pikeville Medical Center Pedestrian Tunnel

Bypass Road closed at least three weeks between two hospital entrances

PIKEVILLE, KY (April 20, 2021) – On Monday, April 26, Pikeville’s Bypass Road (KY 1426) will close to all traffic between the two Pikeville Medical Center entrances for construction of a pedestrian tunnel underneath the highway. The road is expected to remain closed for at least three weeks. The pedestrian tunnel will run from the hospital’s Riverfill parking lot to the grassy area near the main entrance fountain.

The road will be closed between the two hospital entrances (the area in front of the fountain). Vehicles will be able to access the main hospital campus as usual on either side of the work zone: at the main entrance off Harold’s Branch Road as well as the entrance on the other side of the parking garage. However, all truck traffic will be required to use the Harold’s Branch entrance, which leads directly to the loading dock behind the hospital. In addition, people with appointments at the hospital facilities in the Riverfill will be required to use the Baird Avenue entrance to the Riverfill area. Message boards and signs will direct traffic. Hospital security officers will be on site to assist with traffic control.

The tunnel will provide safe, convenient pedestrian access to Pikeville Medical Center’s main campus that does not require people to cross traffic on the heavily traveled roadway. The concrete structure will be 108 feet long, 10 feet wide, and 8 feet high with lighting throughout the walkway and both entrances.

Current traffic estimates along this stretch of KY 1426 range from 11,074 to 13,673 vehicles a day and includes school buses, ambulances, fire trucks and other emergency responders, commercial trucks, and thousands of passenger vehicles.

Pikeville Medical Center employs 3,000 people and sees more than 450,000 patients annually from a 10-county service area. In addition, thousands of visitors, medical students, and vendors require access to the hospital. The possibility of vehicle/pedestrian wrecks is reduced dramatically when pedestrian traffic is removed from the highway. Another benefit is enhanced response time for ambulances and the Pikeville Fire Department. Traffic flow on Bypass Road will be improved, particularly during morning and evening school traffic hours and shift changes at the hospital.

The project is a partnership among Pikeville Medical Center, the City of Pikeville, and the Kentucky Transportation Cabinet. The project contractor, Jig Saw Enterprises, General Contractor, is a Pike County company owned and operated by Rusty Justice, PE. Funding includes $575,000.00 from KYTC’s Department of Rural and Municipal Aid toward the total project cost.

ShareTweetPinShareScanSend
Next Post
Superintendent’s Personnel Action/Update April 19, 2021

Superintendent’s Personnel Action/Update April 19, 2021

Comments 1

  1. KAG says:
    4 years ago

    Any one here about Braidy Industries ?
    Going to start looking at the milk cartoon’s.
    Looks like Bevins pulled a Dear Leader Trick tell them what they want to hear and do nothing

   TheLevisaLazer.Com   
TheLevisaLazer.com

In God We Trust - Established 2008

Follow Us

Quick Links

  • News
  • Lifestyles
  • Stay Ahead with Lazer Sports News
  • Education
  • Obituaries
  • About Us
  • Business & Politics News
  • Addiction & Recovery

Quick Links

  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Big Sandy Sportsman
  • Lazer ad prices and sizes
  • Editorials
  • Lazer announcments, bids and notices
  • Health News

Recent News

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

LADY BULLDOGS LOOK TO PICK UP THE PACE THIS SEASON; OPENER NEXT TUESDAY

November 29, 2024

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.

No Result
View All Result
  • News
  • Stay Ahead with Lazer Sports News
  • Lifestyles
  • Courthouse
  • Top Recollections News – The Levisa Lazer
  • Obituaries
  • Regional News
  • Announcements

© 2024 thelevisalazer.com, All Rights Reserved. Designed and Managing by BizNex Web.